mohsin

Test Post

[fusion_convert_plus convert_plus_module="modal" modal_id="0" slide_in_id="0" info_bar_id="0" display="trigger"] sdfs [/fusion_convert_plus]

October 18, 2021|Uncategorized|

INSTALLATION, COMMISSIONING & INTEGRATION OF RED LIGHT MONITORING SYSTEM AND TRAFFIC SIGNAL CONTROL SYSTEM AT TRAFFIC SIGNAL SITES ALONG ORANGE LINE METRO TRAIN ROUTE AND ALLIED WORK (INVITATION FOR BIDS)

INSTALLATION, COMMISSIONING & INTEGRATION OF RED LIGHT MONITORINGSYSTEM AND TRAFFIC SIGNAL CONTROLSYSTEM AT TRAFFIC SIGNAL SITES ALONGORANGE LINE METRO TRAIN ROUTE ANDALLIED WORK Open [pdf-embedder url="https://psca.gop.pk/wp-content/uploads/2021/05/Traffic-Signal-Tender-Document.pdf"] Advertisement

May 24, 2021|Active Tenders, Tender|
Go to Top